Consultancy Projects

Sl. no. Name of the faculty Consultancy Project Funding agency Duration Year of commencement  Completed/ ongoing SPECIALISATION
1 DR. S.Dutta ISIF Asia 2021 APNICFoundation 2021 ongoing STRUCTURAL/EQ
2 Prof. A.K Dey Soil testng for determination of suitable foundations CPWD,Silchar 6 months 2019 Completed Geotechnical Engg
Causes and remedial measures for sinking of Silchar bypass road PWD,Assam 6 months 2019 Completed
Testing of building materials KMV Projects ltd , Aizawl 6 months 2021 Completed
Investigation of tilting of boundary wall LICI,Silchar HO , Meherpur 6 months 2021 Completed
Soil Testing report GREF 3 months 2021 Completed
Mix Design RIPANS,Aizawl 3 months 2021 Completed
Liquefaction Analysis Starlite Power Transmission limited , Silvassa , India 6 months 2021 completed
3 Dr. A. Kuity Coarse Aggregate Shiv Build India Pvt. Ltd. Kumarghat, Tripura 1 Month 2021 Completed Transportation
Bituminous Mix design for BC, Bitumen, CA Shiv Build India Pvt. Ltd. Kumarghat, Tripura 1 Month 2021 Completed
Bituminous Mix Shiv Build India Pvt. Ltd. Kumarghat, Tripura 1 Month 2021 Completed
Soil, Bitumen testing Shiv Build India Pvt. Ltd. Kumarghat, Tripura 3 Months 2021 Completed
Bitumen International Consultants and Technocrats Pvt. Ltd. 1 Month 2021 Completed
4 Dr. K. L. Singh Improvement / Widening to 2 laning of strecth from Khongsang to Tamenglong of NH-137 Shivalaya Construction Pvt. Ltd. 3 Months 2021 Completed Transportation
5 Prof. M. A. Ahmed Scrutiny of Project Proposals for the State of Assam under Pradhan Mantri Gram Sadak Yojana NRRDA-PMGSY 1 Months 2021 Completed Transportation
Scrutiny of Project Proposals for the State of Assam under Pradhan Mantri Gram Sadak Yojana NRRDA-PMGSY 1 Months 2021 Completed
Scrutiny of Project Proposals for the State of Assam under Pradhan Mantri Gram Sadak Yojana NRRDA-PMGSY 1 Months 2019 Completed
6 Pallab Das Vetting of structural Drawings MGCC Ltd , Shillong 6 months 2021 Completed STRUCTURAL/EQ
MIx Design Shaare Project Ltd 2018 Completed
NEEPCO Ltd. N.D.T Test 2018 Completed
S.L.T Infracon MIx Design 2018 Completed
M.S.V Infrastructure Material Testing 2018 Completed
B.S Construction Ltd Pile load Test 2018 Completed
7 Dr.Tauhidur Rahman Proof Checking PWD Govt of Assam 2 months 2019 Completed STRUCTURAL/EQ
8 Prof. A.I Laskar Proof Checking BIPL-BVEPL 2018 Completed STRUCTURAL/EQ
Proof Checking NEER NIRMAL PARIYOJNA, ASSAM 2018 Completed
MIX DESIGN GAUTAM CONSTRUCTION 2018 Completed
9 Dr. A.K Das Preparation of Geotechnical report for construction of proposed commercial complex FRONTEK Sales Pvt Ltd 3 months 2021 Completed Geotechnical Engg
10 Prof. A.K. Barbhuiya Pile Load Test NCC limited 2020 Completed Water ResourcesEngg
Soil Investigation Taj Uddin Latimara. Katigorah 2021 Completed Water ResourcesEngg
Dr BS Sil Technical guidance in Silchar-Kalain Road Silchar W R Division 2018 Completed Water Resources Engg
11 Prof U Kumar Water AE, SCSD-II CPWD, Silchar 2021 Completed Environmental Engg
Boulder, Soil AE-TEAM Leader Rodic Consultants Pvt. Ltd. in JV with TPF 2021 completed Environmental Engg
12 Dr Kulkarni V V Random Verification Of Annual Inventory Report On Hazardous Waste Management Central Pollution Control Board, New Delhi 6 months 2021 ongoing Environmental Engg